  Image_75.jpg - 9/04/2007  The move of the 8-BM Bending Magnet Beam Line to 24-BM is in progress. Shown is the installation of the detector support frame.  
Image_74
Image_73
Image_72
Image_71
Image_70

9/04/2007 The move of the 8-BM Bending Magnet Beam Line to 24-BM is in progress. Shown is the installation of the detector support frame.