EIGER2 X Installed on 24-ID-C
Submitted by Updates on Tue, 01/07/2020 - 14:02
The APS is currently in shutdown for maintenance until the end of January and NE-CAT has used this opportunity to move the EIGER2 from the dry lab and onto the C beamline. The new detector still needs its protective cover, colloquially called the guillotine, manufactured by Ed Lynch before commissioning proceeds.